Price list on offer until 30 September 2026 · DDP — also Sardinia and islands (contact us) See offers · BMS Seplos V3 / JK · prices to confirm by email

3 inverters + 3 batteries · ~51 kWh

Three-phase off-grid setup: one Growatt CEG per phase (L1/L2/L3) and three CEG batteries. Custom quote by email.

CEG three-phase install: 3 Growatt and 3 batteries
Typical power 18 kW (3 × 6 kW). Indicative storage ~51 kWh with three ~16 kWh boxes (or Op1/Op3/Op4 mix). Full kit price: confirm by email depending on cells, shipping origin (China/Europe) and BMS.

Typical configuration

  • 3 × Growatt 6 kW – Carmine Energia Gratis (one per phase)
  • 3 × CEG 48 V batteries (~16 kWh each, EVE/CATL/MB31 of choice)
  • Parallel/series wiring per support diagram
  • Optional: Magic Box, DC panel, data logger Wi-Fi

Variants

Also possible 2+2+2 (six inverters) or mix 12 kW. The official poster shows the 18 kW setup with 34 kWh storage (two batteries). A three-battery kit (~51 kWh) is quoted by email.

Request a quote Growatt Batteries

Contact us now Send an email